{"id":1442,"date":"2020-03-02T09:38:35","date_gmt":"2020-03-02T13:38:35","guid":{"rendered":"https:\/\/team2869.org\/?p=1442"},"modified":"2022-01-15T23:03:49","modified_gmt":"2022-01-16T03:03:49","slug":"week-9","status":"publish","type":"post","link":"https:\/\/team2869.org\/?p=1442","title":{"rendered":"Week 9"},"content":{"rendered":"\n<p>Mechanically certain issues with the bot were identified and fixed within the first few days of this week. Specifically, with the placement of the battery and the ball intake which both already have a solution in mind which will be worked on throughout this week. <\/p>\n\n\n\n<p>The ball track design and intake were finalized and mounted on to the bot. All there is now to do is some last touches of wiring and some testing to finish out the week.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large is-resized\"><img fetchpriority=\"high\" decoding=\"async\" src=\"https:\/\/team2869.org\/wp-content\/uploads\/2020\/03\/IMG_20200228_165921-1024x715.jpg\" alt=\"\" class=\"wp-image-1444\" width=\"538\" height=\"375\" srcset=\"https:\/\/team2869.org\/wp-content\/uploads\/2020\/03\/IMG_20200228_165921-1024x715.jpg 1024w, https:\/\/team2869.org\/wp-content\/uploads\/2020\/03\/IMG_20200228_165921-300x210.jpg 300w, https:\/\/team2869.org\/wp-content\/uploads\/2020\/03\/IMG_20200228_165921-768x536.jpg 768w, https:\/\/team2869.org\/wp-content\/uploads\/2020\/03\/IMG_20200228_165921-1536x1073.jpg 1536w, https:\/\/team2869.org\/wp-content\/uploads\/2020\/03\/IMG_20200228_165921-2048x1430.jpg 2048w, https:\/\/team2869.org\/wp-content\/uploads\/2020\/03\/IMG_20200228_165921-1546x1080.jpg 1546w, https:\/\/team2869.org\/wp-content\/uploads\/2020\/03\/IMG_20200228_165921-600x419.jpg 600w\" sizes=\"(max-width: 538px) 100vw, 538px\" \/><\/figure>\n\n\n\n<p>Week 0 field elements are coming to a finish. A two-man team is finishing off the new objectives while another two-man team is visualizing the field and checking that everything is in tiptop shape!<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Mechanically certain issues with the bot were identified and fixed within the first few days of this week. Specifically, with the placement of the battery and the ball intake which both already have a solution in mind which will be worked on throughout this week. The ball track design and intake were finalized and mounted&hellip; <br \/> <a class=\"read-more\" href=\"https:\/\/team2869.org\/?p=1442\">Read more<\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":[],"categories":[45],"tags":[],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/team2869.org\/index.php?rest_route=\/wp\/v2\/posts\/1442"}],"collection":[{"href":"https:\/\/team2869.org\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/team2869.org\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/team2869.org\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/team2869.org\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=1442"}],"version-history":[{"count":2,"href":"https:\/\/team2869.org\/index.php?rest_route=\/wp\/v2\/posts\/1442\/revisions"}],"predecessor-version":[{"id":1446,"href":"https:\/\/team2869.org\/index.php?rest_route=\/wp\/v2\/posts\/1442\/revisions\/1446"}],"wp:attachment":[{"href":"https:\/\/team2869.org\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=1442"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/team2869.org\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=1442"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/team2869.org\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=1442"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}