{"id":1365,"date":"2020-01-14T17:56:00","date_gmt":"2020-01-14T21:56:00","guid":{"rendered":"https:\/\/team2869.org\/?p=1365"},"modified":"2020-02-06T17:43:42","modified_gmt":"2020-02-06T21:43:42","slug":"day-6-8","status":"publish","type":"post","link":"https:\/\/team2869.org\/?p=1365","title":{"rendered":"Day 6\u20138 (Jan. 14)"},"content":{"rendered":"\n<div class=\"is-layout-flex wp-container-3 wp-block-columns\">\n<div class=\"is-layout-flow wp-block-column\" style=\"flex-basis:33.33%\">\n<figure class=\"wp-block-image size-large is-resized\"><img fetchpriority=\"high\" decoding=\"async\" src=\"https:\/\/team2869.org\/wp-content\/uploads\/2020\/01\/saj.png\" alt=\"\" class=\"wp-image-1373\" width=\"173\" height=\"299\"\/><\/figure>\n<\/div>\n\n\n\n<div class=\"is-layout-flow wp-block-column\" style=\"flex-basis:66.66%\">\n<p>Our first full Saturday was a very busy day. We created a prototype for the ball intake and worked on the chassis modification (C channel shape).<\/p>\n\n\n\n<p>We created a proof of concept in CAD for the ball intake, and a elevator for the switch.&nbsp;<\/p>\n\n\n\n<p>We obtained additional colored vinyl to build our &#8220;switch color wheel&#8221;.<\/p>\n<\/div>\n<\/div>\n\n\n\n<p>\u00a0<\/p>\n<p>CAD drawings were created for the shield generator to plan how to build it out of wood and metal (for our regal eagle rampage). Left over 2&#215;4 were cut for the structure.<\/p>\n<p>We have a large order for our lumber arriving tomorrow.<br \/><br \/><\/p>\n<p>\u00a0<\/p>\n\n\n\n<figure class=\"wp-block-image size-large is-resized\"><img decoding=\"async\" src=\"https:\/\/team2869.org\/wp-content\/uploads\/2020\/01\/Annotation-2020-01-14-171120.png\" alt=\"\" class=\"wp-image-1370\" width=\"399\" height=\"422\" srcset=\"https:\/\/team2869.org\/wp-content\/uploads\/2020\/01\/Annotation-2020-01-14-171120.png 754w, https:\/\/team2869.org\/wp-content\/uploads\/2020\/01\/Annotation-2020-01-14-171120-283x300.png 283w, https:\/\/team2869.org\/wp-content\/uploads\/2020\/01\/Annotation-2020-01-14-171120-600x636.png 600w\" sizes=\"(max-width: 399px) 100vw, 399px\" \/><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>Our first full Saturday was a very busy day. We created a prototype for the ball intake and worked on the chassis modification (C channel shape). We created a proof of concept in CAD for the ball intake, and a elevator for the switch.&nbsp; We obtained additional colored vinyl to build our &#8220;switch color wheel&#8221;.&hellip; <br \/> <a class=\"read-more\" href=\"https:\/\/team2869.org\/?p=1365\">Read more<\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":[],"categories":[45],"tags":[],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/team2869.org\/index.php?rest_route=\/wp\/v2\/posts\/1365"}],"collection":[{"href":"https:\/\/team2869.org\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/team2869.org\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/team2869.org\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/team2869.org\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=1365"}],"version-history":[{"count":4,"href":"https:\/\/team2869.org\/index.php?rest_route=\/wp\/v2\/posts\/1365\/revisions"}],"predecessor-version":[{"id":1374,"href":"https:\/\/team2869.org\/index.php?rest_route=\/wp\/v2\/posts\/1365\/revisions\/1374"}],"wp:attachment":[{"href":"https:\/\/team2869.org\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=1365"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/team2869.org\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=1365"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/team2869.org\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=1365"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}